Qukaim Electrolytic Polarized Capacitors 20pcs 450V 22µF 105℃ Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, High Voltage
FREE Shipping
Qukaim Electrolytic Polarized Capacitors 20pcs 450V 22µF 105℃ Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, High Voltage
- Brand: Unbranded
Qukaim Electrolytic Polarized Capacitors 20pcs 450V 22µF 105℃ Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, High Voltage
- Brand: Unbranded
Save € 12,10 (42%)
RRP
Save € 12,10 (42%)
RRP
We accept the following payment methods
Description
- Brand: Unbranded
- Category: Capacitors
- Fruugo ID: 405372327-859896452
- EAN: 9301540015686
Product Safety Information
Please see the product safety information specific to this product outlined below
The following information is provided by the independent third-party retailer selling this product.
Product Safety Labels
Delivery & Returns
Dispatched within 24 hours
-
STANDARD: FREE - Delivery between Tue 11 November 2025–Mon 17 November 2025 - FREE
Shipping from China.
We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy
Product Compliance Details
Please see the compliance information specific to this product outlined below.
The following information is provided by the independent third-party retailer selling this product.
Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.
- Shenzhenshi Desheng Wangluo Keji Youxian Gongsi
- Shenzhenshi Desheng Wangluo Keji Youxian Gongsi
- NO,606-23-220,MeinianGuojiGuangChangZhaoshangJiedaoNanHaidadao yixiShenzhenGuangdong
- Shenzhen
- CN
- 518000
- GoodLuck856@163.com
- 8613164761511
Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.
- SINO-SEAR GmbH
- SINO-SEAR GmbH
- Feuerbachstrasse 11, 14471 Potsdam, Germany
- Potsdam
- DE
- 14471
- info@sino-sear.com
- 4933195130908