Lightweight Weatherproof Training Leash for Dogs - Reflective, Non-Absorbent, and Durable Long Lead

€ 11,95
+ € 13,99 Shipping

Lightweight Weatherproof Training Leash for Dogs - Reflective, Non-Absorbent, and Durable Long Lead

  • Brand: Unbranded
Sold by:

Lightweight Weatherproof Training Leash for Dogs - Reflective, Non-Absorbent, and Durable Long Lead

  • Brand: Unbranded

€ 11,95

Save € 10,00 (45%)

RRP

€ 21,95
In stock
+ € 13,99 Shipping
Sold by:

€ 11,95

Save € 10,00 (45%)

RRP

€ 21,95
In stock
+ € 13,99 Shipping

We accept the following payment methods

Description

Reflective Design: Stay visible during evening walks with our reflective dog leash, ensuring safety and style. Durable Classic Dog Leash: Crafted with high-density nylon, this leash offers superior durability and longevity. Water-resistant Fabric: Designed for ease, the leash's fabric repels water, making it quick to clean and maintain. Adjustable & Comfortable: The leash features an adjustable handle for various grip options, enhancing comfort during use. Universal Compatibility: Suitable for all dog sizes, from small puppies to large breeds, ensuring a versatile walking companion. Elevate your dog-walking experience with our classic, durable, and stylish nylon leash. Perfect for both daytime adventures and safe nighttime strolls, thanks to its reflective properties. Its water-resistant fabric makes maintenance hassle-free, ensuring your leash looks great even after rainy days.
  • Fruugo ID: 392007900-838860165
  • EAN: 9113733375213

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Safety Warnings: Warning: If the product is found to be damaged, deformed or abnormal in performance, please stop using it immediately and contact us

Delivery & Returns

Dispatched within 2 days

  • STANDARD: € 13,99 - Delivery between Thu 13 November 2025–Fri 21 November 2025

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Cai Zemang
  • Shenzhen Maosheng Communication Co., Ltd.
  • Room 302, 3rd Floor, No. 7, Lane 6, Changlong New District, Buji Street, Longgang District, Shenzhen
  • Shenzhen
  • CN
  • 518000
  • emmalikeswan@126.com
  • 17764582480

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Van Lavazza
  • Y & H S.R.L.
  • Via Gravina 21 MT matera,Trani,Puglia
  • Trani
  • Italy
  • 75100
  • itlyhsrl@gmail.com
  • 0039 3917722149